NationalGalleryofArt
A floor-to-roof-terrace guide to the National Gallery’s renovated East Building →
“Revisiting the National Gallery of Art’s East Building, which is reopening Friday after a three-year renovation, is like greeting an old friend. She still has all the same familiar qualities, and conversation picks up as if no time has passed at all. But you also can’t help but notice: She looks good.”
Subtle changes make a big impression at the National Gallery East Building →
“Visitors new to the National Gallery of Art’s East Building might not detect any sign that it has undergone a major renovation. The galleries of the I.M. Pei-designed modernist addition to the National Gallery have been closed for refurbishment since 2013. On Sept. 30, they will reopen with 12,250 square feet of new exhibition space, two new stairwells creating improved public flow through the galleries, some 500 permanent collection works on display (up from 350 before the redesign), two new sky-lit tower galleries devoted to giants of 20th-century art, and a new open-air sculpture terrace along Pennsylvania Avenue.”
See how Washington's National Gallery of Art has grown →
Reopening this week, I.M. Pei’s East Building just got better—without getting any bigger
“Step inside and the differences become clear. The gallery, which reopens to the public on 30 September, has managed to carve out more than 12,250 sq. ft of additional exhibition space without expanding its physical footprint. The changes have inspired a comprehensive reinstallation of the collection that will transform the way more than four million annual visitors understand the story told by DC’s premier art museum.”
East Building Galleries Reopen September 30 →
Rendering of the interior of the new Pod 1 Tower Gallery in the National Gallery of Art East Building, featuring works by Mark Rothko from the permanent collection of modern and contemporary art.
“On September 30, 2016, the East Building galleries of the National Gallery of Art, which house the modern collection and several temporary exhibition spaces, will reopen after three years of renovation of existing galleries and construction of new galleries and a roof terrace. A completely new configuration of the permanent collection of modern art will be unveiled to the public on this date.”
National Gallery of Art Reopens Newly Renovated and Expanded East Building on September 30, 2016 →
“Washington, DC—On September 30, 2016, the East Building galleries of the National Gallery of Art, which house the modern collection and several temporary exhibition spaces, will reopen after three years of renovation of existing galleries and construction of new galleries and a roof terrace. A completely new configuration of the permanent collection of modern art will be unveiled to the public on this date.”
National Gallery of Art Receives $30 Million in Donations to Add 12,260 Square Feet of New Exhibition Space to the East Building →
“Washington, DC—The National Gallery of Art plans to construct with private donations 12,260 square feet of art exhibition space within the current footprint of the East Building on the National Mall. The new spaces will include an outdoor sculpture terrace overlooking Pennsylvania Avenue and two flanking sky-lit interior Tower Galleries. They will primarily display modern art from the permanent collection. This work will occur in coordination with the federally funded Master Facilities Plan, a renovation program that began in the West Building in 1999 and continues in the East Building. During this phase of the East Building renovation, galleries will close on a gradual basis from July 2013 through December 2013, when all of the galleries will be closed. Construction will begin in January 2014 and last approximately three years, at which time the galleries will reopen. Subsequent phases of the renovations in other parts of the East Building will be announced at a later date.”